| Project Info |
Guidewell Port St. Lucie Retail Center Renovation - Port St. Lucie, FL 34986 - Bids Due: 04/30/2026 01:00 PM 4,800 SF interior TI renovation of shell building that is currently under construction. Trades include millwork, roofing, storefront, doors, drywall/ACT, flooring, paint, specialties, window film, and MEP systems. Mechanical controls direct to GC.
***NOTE: Mechanical and plumbing scopes are budgetary until project award at which time Auld & White will complete design. Auld & White will be going to contract based on this budget.***
Shell permit drawings available for reference only.
Estimated completion of building shell: October/November 2026. Interior buildout may be able to start earlier.
Interior buildout substantial completion: December 2026.
RFIs due 4/15 by 5:00PM. |
SJC Utility Access Control - St. Augustine, FL 32084 - Bids Due: 04/28/2026 01:00 PM Join us in bidding this Access Control upgrade for Saint Johns County Utility Department.
Trades needed include demolition, framing, ACT, paint, flooring, doors, hardware, electrical, fire alarm, and access control.
Please note Option 1 on Sheet E1 to replace existing access control with new. |
SJC Human Resources Remodel - St. Augustine , FL 32084 - Bids Due: 04/28/2026 01:00 PM Please join us bidding this interior remodel.
Trades needed include Demolition, doors hardware, framing drywall, ACT, flooring, painting. |
HCA Memorial Health UMC Savannah - Pooler FSER - Pooler , GA 31322 - Bids Due: 04/27/2026 01:00 PM New construction of single story 10,980 sq. ft. freestanding emergency department on a 2.35-acre site for HCA Memorial Health University Medical Center in Pooler, GA.
Trades include sitework, landscape & irrigation, concrete, architectural precast, CMU, brick veneer, decorative bollards, structural steel, millwork, waterproofing, metal wall paneling, roofing, doors & hardware, automatic entrances & operators, impact storefront, stucco / EIFS, flooring, painting, toilet accessories, wall protection, lockers, curtains & track, interior & exterior signage, pre-engineered canopies, window shades, plumbing & med gas, fire sprinklers, HVAC, electrical, fire alarm, voice data, paging, CCTV, access control, nurse call, and lightning protection,
RFI's due by 04/03 by 4:00 PM.
Anticipated construction start is October 2026. |
Aspire Church San Marco Campus Renovations - Jacksonville, FL 32207 - Bids Due: 04/21/2026 01:00 PM Project Description: 1st Floor: Removal of the existing portico and construction of a new church lobby. Approximately +/- 1068 SF. Alterations/renovations to the main hall and restrooms. Approximately +/- 3346 SF.
2nd Floor: Alterations/renovations to the male & female restrooms. Approximately +/- 436 SF.
3rd Floor: Alterations/renovations to the male & female restrooms. Approximately +/- 364 SF.
Civil works as per the drawings.
Work includes but is not limited to demo work, sitework package, pavers (to be confirmed), landscaping, concrete, masonry, structural steel, miscellaneous metals, millwork, Dekton Engineered surface panels, roofing, waterproofing, doors/frames/hardware, storefronts, stucco, drywall/ceilings, flooring, painting, specialties, signage, pre-engineered canopy system, plumbing, fire protection, HVAC and electrical.
Controls:
Fire Alarm: Johnson/Simplex
Site walk date: TBD
Anticipated start date: TBD
|