| Project Info |
HCA Memorial Health UMC Savannah - Pooler FSER - Pooler , GA 31322 - Bids Due: 04/27/2026 01:00 PM New construction of single story 10,980 sq. ft. freestanding emergency department on a 2.35-acre site for HCA Memorial Health University Medical Center in Pooler, GA.
Trades include sitework, landscape & irrigation, concrete, architectural precast, CMU, brick veneer, decorative bollards, structural steel, millwork, waterproofing, metal wall paneling, roofing, doors & hardware, automatic entrances & operators, impact storefront, stucco / EIFS, flooring, painting, toilet accessories, wall protection, lockers, curtains & track, interior & exterior signage, pre-engineered canopies, window shades, plumbing & med gas, fire sprinklers, HVAC, electrical, fire alarm, voice data, paging, CCTV, access control, nurse call, and lightning protection,
RFI's due by 04/03 by 4:00 PM.
Anticipated construction start is October 2026. |
Aspire Church San Marco Campus Renovations - Jacksonville, FL 32207 - Bids Due: 04/15/2026 01:00 PM Project Description: 1st Floor: Removal of the existing portico and construction of a new church lobby. Approximately +/- 1068 SF. Alterations/renovations to the main hall and restrooms. Approximately +/- 3346 SF.
2nd Floor: Alterations/renovations to the male & female restrooms. Approximately +/- 436 SF.
3rd Floor: Alterations/renovations to the male & female restrooms. Approximately +/- 364 SF.
Civil works as per the drawings.
Work includes but is not limited to demo work, sitework package, pavers (to be confirmed), landscaping, concrete, masonry, structural steel, miscellaneous metals, millwork, Dekton Engineered surface panels, roofing, waterproofing, doors/frames/hardware, storefronts, stucco, drywall/ceilings, flooring, painting, specialties, signage, pre-engineered canopy system, plumbing, fire protection, HVAC and electrical.
Controls:
Fire Alarm: Johnson/Simplex
Site walk date: TBD
Anticipated start date: TBD
|
Cornerstone Classical Academy Wildlight - Yulee, FL 32097 - Bids Due: 04/10/2026 01:00 PM Negotiated new construction for Cornerstone Classical Academy's Wildlight campus including 2-story classroom building with kitchen and cafenasium totaling +/- 70,800 sq. ft. on a +/- 15-acre site.
Trades include sitework, retaining walls, fencing, landscape & irrigation, tilt-up concrete, architectural precast, CMU & brick veneer, structural steel, millwork, waterproofing, spray foam insulation, TPO & metal roofing, doors & hardware, aluminum storefront, drywall & ceilings, acoustical room components, FRP, resilient & tile flooring, sports flooring, painting, toilet partitions & accessories, lockers, flagpole, marker & tack boards, interior & exterior signage, pre-engineered canopies & walkway covers, foodservice equipment, residential appliances, athletic equipment, gym divider curtain, roller shades, hydraulic elevator, plumbing & gas, fire sprinklers, HVAC, electrical, fire alarm, voice data, intercom, access control, CCTV and audio visual systems.
Anticipated construction start is July 2026. |